Scheduling Assisted a construction contractor in the preparation of a construction schedule to ortimize utilization of construction forces involved in the refacing of a navigation lock wall on the Snake River, recognizing maintenance of river traffic was required during performance of the contract work. Washington
Estimating Formed and directed an interdisciplinary team to conduct an independent cost estimate of the (then) proposed initial 18-mile segment proposed for the Los Angeles subway system, based on the pre-preliminary design. California
Value Engineering Formed and directed an interdisciplinary team to conduct a preliminary value engineering review of the (then) proposed initial segment 18-mile segment of the Los Angeles subway system. California
Risk Identification and Management Formed and directed an interdisciplinary team to conduct a risk identification, analysis and management study, with recommendations, for the (then) proposed initial 18-mile segment of the Los Angeles subway system. California
Scheduling Prepared three conceptual schedules (normal and two accelerated) for options for consideration for the design and construction (including start-up) for the expansion of an existing waste treatment plant to accommodate additional capacity requirements associated with the early construction completion of a large brewery. Colorado
Scheduling Assisted a disadvantaged business enterprise (DBE) in the development of a CPM schedule for an air cargo facility to be constructed at an international airport. The schedule was required for compliance with contract provisions. Colorado
Value Engineering Participated as the civil/structural and cost estimating team member on a value engineering engagement for the design of an underground subway station in downtown Los Angeles where heavy rail and light rail lines intersected. California
Value Engineering Participated as the civil/structural and cost estimating team member on a value engineering engagement for the design of the mid-corridor (20-mile) section of the Los Angeles-to-Long Beach light rail line. This section was characterized primarily as surface guideway with some aerial structures. California
Design Review Process Performed a study of the design review process involving several bid package sections of the Los Angeles-to-Long Beach light rail line to assess the adequacy and effectiveness of design communications and the accuracy of incorporation of "flagged" items into formal design revisions. California
Estimating Performed an independent estimate of cost and time to complete construction, at the reported 70 per cent stage of construction, of the Los Angeles-to-Long Beach light rail line. California
Estimating Performed an independent estimate of cost and time to complete construction, at the reported 60 per cent stage of construction, of the initial operating segment of the Los Angeles subway. California
Fire Investigation Participated as a special team member on an independent review to determine the most probable cause and origin of an underground tunnel fire occuring during construction of the initial operating segment of the Los Angeles subway. The team also developed definitive recommendations for preventing such fires during subsequent construction. California
Estimating Performed an independent estimate of the cost and time to complete construction, at the reported 70 per cent stage of construction, of a design/build coal transfer (rail to ship) facility. California
Project Management Performed an independent assessment of project management on the design and construction of a multi-million dollar residential development located in a remote mountainous area. Colorado




7420 South Harrison Way